• Propane gas pump for lower operating cost propane buses
  • New adhered rubber roof installed High School
  • Variable frequency drives installed on circulating pumps to slow them down when full flow is not required
  • Unit ventilators replacing old undersized units
  • Trane controls installed for better control and optimization of the building

Energy Conservation project with the Colfax School District

An energy conservation project for the Colfax School District that included variable frequency drives, roof improvements with added insulation, unit ventilators, updated DDC controls, updated propane bus infrastructure, and lighting controls.

 

Market

Education