Sauk Prairie Hospital
H&H completed the electrical for Sauk PrairieHospitalk in Prairie du Sac, Wisconsin. The new, complete hospital included:
- 160,000 sqft
- All Division 26, 27, 28
- Site and Road Lighting
- MRI and Cath labs
- New Helipad
- Central Utility Plant
- Parallelling switch gear
- Dual feed utility
Note: Significant cost savings by use of BIM, Pre-fabrication, and Trimble/robotic layout